Dogfennau Cais Drafft

Draft Application Documents – Dogfennau Cais Drafft 

All of the draft application documents are available to download below.

Design and Access Statement 

Green Infrastructure Statement

Planning Statement 

Non Technical Summary 

Draft Environmental Statement Chapters (Volume 1)

Table of Contents 

Chapter 1: Introduction 

Chapter 2: EIA Approach 

Chapter 3: Design, Evolution and Alternatives

Chapter 4: Description of the Project

Chapter 5: Planning Policy 

Chapter 6: Land and Visual Impact Assessment 

Chapter 7: Traffic and Transport 

Chapter 8: Ecology 

Chapter 9: Historic Environment 

Chapter 10: Water Resources and Flood Risk

Chapter 11: Summary of Mitigation 

 

Draft Environmental Statement – Figures (Volume 2)

Table of Contents 

Chapter 2 – Figure 2.1 – Cumulative Projects Plan

Chapter 4 – Figure 4.1 – Grid connection and proposed construction compound location

Chapter 6 – Figure 6.1 – Zone of theoretical visibility plan

Chapter 6 – Figure 6.2 – Public rights of way plan

Chapter 6 – Figure 6.3 – Local Landscape Character Plan

Chapter 6 – Figure 6.4 – LANDMAP Visual and Sensory Aspect Areas

Chapter 6 – Figure 6.5 – Landscape Designations Plan

Chapter 6 – Figure 6.6 – Viewpoint 1

Chapter 6 – Figure 6.7 – Viewpoint 2

Chapter 6 – Figure 6.8 – Viewpoint 3

Chapter 6 – Figure 6.9 – Viewpoint 4

Chapter 6 – Figure 6.10 – Viewpoint 5

Chapter 6 – Figure 6.11 – Viewpoint 6

Chapter 6 – Figure 6.12 – Viewpoint 7

Chapter 7 – Figure 7.1 – Local Road Network Summary

Chapter 7 – Figure 7.2 – Transport Network Summary

Chapter 7 – Figure 7.3 – Accident Assessment Area

Chapter 7 – Figure 7A.1 – Draft Construction Traffic Management Plan

Chapter 7 – Figure 7B.1 – Draft Public Rights of Way Management Plan

Chapter 7 – Figure 7B.2 – Forestry track access interactions with PRoWs

Chapter 7 – Figure 7B.3 – ORPAs and OALs affected by the Project

Chapter 8 – Figure 8.1 – Survey area 

Chapter 8 – Figure 8.2 – Statutory Designated Sites within 10km 

Chapter 8 – Figure 8.3 – Non Statutory Designated Sites within 2km

Chapter 8 – Figure 8.4 – Phase 1 Habitat results

Chapter 8 – Figure 8.5 – Priority Habitats and Ancient Woodland

Chapter 9 – Figure 9.1 – Designated Heritage Assets

Chapter 9 – Figure 9.2 – Designated Heritage Assets and ZTV within 3km

Chapter 10 – Figure 10.1 Surface Water Features

Chapter 10 – Figure 10.2 Bedrock geology composition

Chapter 10 – figure 10.3 Superficial geology composition

Chapter 10 – Figure 10.4 Groundwater vulnerability

Chapter 10 – Figure 10.5 Flood Map for Planning – Fluvial flood risk

Chapter 10 – Figure 10.6 Development Advice Maps – Fluvial flood risk 

Chapter 10 – Figure 10.7 Flood map for planning – Surface water and small watercourses flood risk 

 

Appendices (Volume 3)

Table of Contents

Appendix 1A – Competent Experts

Appendix 1B – Glossary and Abbreviations

Appendix 2A – Scoping Report

Appendix 2B – Scoping Opinion

Appendix 4A – Construction and Environmental Management Plan

Appendix 4A (Annex A) NVMP

Appendix 4B – Coal Mining Risk Assessment

Appendix 4B (Annex A) Drawings

Appendix 4B (Annex B) Notes and Limitations

Appendix 4B (Annex C) Mining Remediation Authority Consultants Coal Mining Report 

Appendix 4B (Annex D) Historical Borehole records

Appendix 4C – Project Infrastructure

Appendix 6A-Landscape and Visual Impact Assessment LVIA Methodology and Glossary

Appendix 6B – Landscape Baseline Descriptions and Sensitivity Assessments 

Appendix 6C – Visual Baseline Descriptions and Sensitivity Assessments

Appendix 6D – Local Landscape Character Assessment and LANDMAP VSAA Assessment

Appendix 6E – Visual Assessment

Appendix 7A – Outline Construction Traffic Management Plan

Appendix 9B -Stage 1 Settings Assessment Scoping for Historic Assets

Appendix 10A – Local Sewer Network